Xoten-Chaqiliq thih-lō͘
Xoten-Chaqiliq thih-lōo (ing-gí: Hotan–Ruoqiang (Qakilik) railway; hàn-gí: 和若鐵路) sī Tiong-kok Sin-kiong ê tsi̍t-liâu thih-lōo suàñ. Set-kè sî-sok uî 120 kong-lí (75 ing-lí/sió-sî), tī 2022-nî 6-gue̍h uân-kang.[1][2][3]
Xoten-Chaqiliq thih-lōo | |||
---|---|---|---|
Tiong-kok Sin-kiong Xoten-Chaqiliq thih-lōo ê uī-tì | |||
Ki-pún chu-liāu | |||
Chāi-tē miâ | 和若铁路 | ||
Chōng-hóng | Ūn-tsok tang-tiong | ||
Khí-tiám Chiong-tiám |
Hotan Ruoqiang (Qakilik) | ||
Continues from | Kashgar–Hotan railway | ||
Connecting lines | Golmud–Korla railway | ||
Ho̍k-bū | |||
Ho̍k-bū lūi-hêng | Heavy rail | ||
Le̍k-sú | |||
Ki-su̍t | |||
Lō͘-soàⁿ tn̂g-tō͘ | 825.5 km (513 mi) | ||
Kúi-tō piau-chún | 1,435 mm (4 ft 8+1⁄2 in) phiau-chún thih-ki-kui | ||
Sok-tō͘ | 120 km/h (75 mph) | ||
|
Tsù-kái
siu-kái- ↑ "456公里,和若铁路铺轨过半" [456 km, over half the track for the Hotan–Ruoqiang railway has been laid] (ēng Hôa-gí). cnr.cn. 30 April 2021. 30 April 2021 khòaⁿ--ê.
- ↑ "国家发改委同意新建和田至若羌铁路,总投资221.5亿元" (ēng Hôa-gí). Sina. 8 May 2018. 30 April 2021 khòaⁿ--ê.
- ↑ "和若铁路正式"闭环"". 高铁网 (ēng Hôa-gí). 2021-11-19. 2021-11-20 khòaⁿ--ê.
Tsham-ua̍t
siu-kái- CATOBAR
- Tiong-goân im-ūn (tiong-guân im-ūn; hàn-gí: 平水韻)
- Hông-bú chèng-ūn (hông-bú tsìng-ūn; hàn-gí: 韻集)
- Hông-bú chèng-ūn (hông-bú tsìng-ūn; hàn-gí: 古今韻會舉要)
- Hông-bú chèng-ūn (hông-bú tsìng-ūn; hàn-gí: 古今韻會舉要)