Siōng-hái kuí-tō kau-thong 4-hō sòaⁿ
Siōng-hái kuí-tō kau-thong 4-hō suàñ (hàn-gú: 上海軌道交通4號線; (teh thong-tshia tsìn-tsîng mā hông kiò-tsò "Bîng-tsu-suàñ 2-kî" (明珠線二期)[4]); ing-gú: Line 4 (Shanghai Metro)) sī tsit-tiâu uì Tiongkok Siōng-hái-tshī tshî-huē-khu Gî-san-lōo tsām , iû Siōng-hái Siōng-hái tē-thih îng-ūn ê khuañ-suàñ tē-thih lōo-suàñ, tsuân-tn̂g 2.032 km, lóng-tsóng set-tī 17-tsō tshia-tsām, tī 2005-nî 12-gue̍h 31-ji̍t thong-tshia îng-ūn. 4-hō suàñ sī Tiong-kok tē-it -tiâu tsuân-kok "Tsuân-kok kang-lâng sen-hong-hō " tē-thih lōo-suàñ[5].
Siōng-hái kuí-tō kau-thong 4-hō suàñ | |||
---|---|---|---|
Gî-san-lōo tsām lāi-pōo ê kíng-kuan. | |||
Ki-pún chu-liāu | |||
Kî-thaⁿ miâ |
M4 (planned name); Pearl line phase II ((Hàn-gí)); Loop line ((Hàn-gí)) | ||
Chāi-tē miâ | 上海地铁4号线 | ||
Chōng-hóng | Tong-ûn ho̍k-bū-tiong | ||
Só͘-iú-chiá | Shanghai Rail Transit Pearl Line (Phase II) Development Co., Ltd. (except shared track with line 3 portion) | ||
Êng-ūn tē-khu | Huangpu, Xuhui, Changning, Putuo, Jing'an, Hongkou, Yangpu, and Pudong districts, Shanghai, China | ||
Khí-tiám Chiong-tiám | Continuous loop from/to Pang-bô͘:Stl (terminal for trains to depot) | ||
Chhia-chām | 26 (of which 9 shared with line 3) | ||
Ho̍k-bū | |||
Ho̍k-bū lūi-hêng | Rapid transit | ||
Hē-thóng | Shanghai Metro Shanghai Metro | ||
Êng-ūn tan-ūi | Shanghai No. 3 Metro Operation Co. Ltd. | ||
Chhia-lióng ki-tē | Puhuitang Depot | ||
Sú-iōng chhia-lióng | 42 Type A 6-car train | ||
Ta̍k kang Chài-kheh-liōng | 976,000 (2019 Peak)[1] | ||
Le̍k-sú | |||
Commenced | 2001 nî | ||
Khai-thong | 2005 nî 12 goe̍h 31 ji̍t | ||
Last extension | 2007 nî 9 goe̍h 21 ji̍t | ||
Ki-su̍t | |||
Lō͘-soàⁿ tn̂g-tō͘ | 33.7 km (20.9 mi) (of which 11.57 km (7.2 mi) shared with line 3) | ||
Kúi-tō sò͘-liōng | 2 | ||
Kúi-tō lūi-hêng | Underground and elevated (shared track with line 3 portion) | ||
Kúi-tō piau-chún | 1,435 mm (4 ft 8+1⁄2 in) | ||
Electrification | Overhead lines (1500 volts DC) | ||
Sok-tō͘ |
80 km/h (50 mph) Average speed: 32.7 km/h (20 mph) | ||
Signalling |
ALSTOM/CASCO URBALISTM 200[2] (fixed block CBTC, current) CASCO Qiji TACS (2025 exp.)[3] | ||
|
Li̍k-sú ên-kik
siu-káiShanghai metro line 4 opening history | ||||||
---|---|---|---|---|---|---|
Segment | Commencement | Opened | Length | Station(s) | Name | Investment |
Damuqiao Road — Hongqiao Road | 26 Dec 2000 | 31 Dec 2005 | 3.94 km (2.45 mi) | 5 | Pearl Line (second phase) | ¥12.6 billion |
Hongqiao Road — Baoshan Road | 11.52 km (7.16 mi) (tracks sharing) |
9 | Line 3 & 4 realignment project | |||
Baoshan Road — Lancun Road | 9.76 km (6.06 mi) | 8 | Pearl Line (second phase) | |||
Lancun Road — Damuqiao Road | 22 Oct 2005 | 29 Dec 2007 | 8.7 km (5.41 mi) | 4 | Loop line connector project | |
October 11, 2009 became China's first national "Worker Pioneer" subway line.
Tshia-lióng
siu-kái4-hō suàñ le̽t-tshia lóng tshái-iōng A-hîng tshia 6-tsiat pen-tsoo, set-kè sî-sok 80 km/h, uî VVVF kau-liû thuân-tōng, set-kè siū-miā 30-nî. Le̽t-tshia pen-hō tang-tiong 0437-0449 í-king tsioh-tiāu hōo 3-hō suàñ (pen-hō 337-349).
Hiān-miâ | Guân-miâ | Tsè-tsō-siong | Tshia-lióng pen-sîng | Tsè-tsō nî-tāi | Tshia-lióng tsóng-sòo | Tsiūñ-suàñ sî-kan | Līng-miâ |
---|---|---|---|---|---|---|---|
04A01 | AC05 | Tik-kokSiemens | 6A (Tc+Mp+M+M+Mp+Tc) |
2004-2007 | 2-lia̍t (0401,0402) | 2005-nî 12-gue̍h 31-ji̍t | ling-tshuì-á |
Lám-tshia tsu-tsiu tiān-li̍k ki-tshia | 26-lia̍t (0403-0428) | ||||||
04A02 | Pak-tshia Tiông-tshun kuí-tō kheh-tshia | 2014-2017 | 1-lia̍t (0429) | 2015-nî 7-gue̍h 100ji̍t | Pau-kong, Oo-pau-kong | ||
Siōng-hái tiān-khìAlstom | 13列(0430-0436,0450-0455) |
Tshia-tsām tshing-tuañ
siu-káiTshia-tsām le̽t-pió
siu-káiLia̍t-tshia ūn-tsuán king-keh
siu-káiShanghai Metro Line 4 headway[6] | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Sî-kan | Lāi khuan (running clockwise) | Guā khuan (running counterclockwise) | |||||||||
Monday - Friday (Working Days) | |||||||||||
AM peak | 7:00–9:00 |
|
| ||||||||
Off-peak | 9:00–17:00 | About 7 min | |||||||||
PM peak | 17:00–19:30 | About 5 min | |||||||||
Other hours |
|
About 5 - 12 min | |||||||||
Saturday and Sunday (Weekends) | |||||||||||
Peak | 7:00–21:00 | About 6 min and 30 sec | |||||||||
Other hours |
|
About 5 - 12 min | |||||||||
Ki-su̍t
siu-káiKi-tshia tshia-lióng
siu-káiShanghai Metro Line 4 rolling stock | ||||||||
---|---|---|---|---|---|---|---|---|
Set | Manufacturer | Time of manufac- turing |
Type | No of car |
Assembly[lower-roman 1] | Series | Number | Notes |
28 | Siemens (0401,0402) CRRC Zhuzhou Locomotive Co., Ltd. (0403-0428) |
2004-2007 | A[lower-roman 2] | 6 | Tc+Mp+M+M+Mp+Tc | 04A01 | 0401-0428 | [7] Original series name: AC05. In February 2009, 8 trains used on line 2 (numbers: 0225-0232) returned to line 4 (set 04A01; numbers 0421-0428). |
14 | SATCO[lower-roman 3] (0430-0436, 0450-0455) CNR Changchun Railway Vehicles Co., Ltd. (0429) |
2014-2017 | A[lower-roman 2] | 6 | Tc+Mp+M+M+Mp+Tc | 04A02 | 0429-0436 0450-0455 |
An additional 13 trains (numbers 437-449) will be returned to line 4 after line 3 and line 4 are separated. |
| ||||||||
Tsìn-ting ki-tshia tshia-lióng
siu-káiShanghai Metro Line 4 former rolling stock | ||||||||
---|---|---|---|---|---|---|---|---|
Set | Tsè-tsō-siong | Ūn-tsok sî-kan | Hîng-thài | Tshia-siunn ê pian-hō |
Tsoo-ha̍p | Hē-lia̍t | Pen-hō | Pī-tsù |
13 | CNR Changchun Railway Vehicles Co., Ltd. and Shanghai Alstom Transportation Co | A | 6 | Tc+Mp+M+M+Mp+Tc | 04A02 | 0437-0449 | Seconded to line 3 (set 03A02; numbers 337-349). These will be returned to line 4 (set 04A02; numbers 0437-0449) after lines 3 and 4 are separated. | |
-
04A01 tshia-lióng
-
04A02 tshia-lióng
Tsù-kái
siu-kái- ↑ "Metro breaks records" (ēng Hôa-gí). Shanghai Metro 163 Official. 2019-03-09. 2019-03-09 khòaⁿ--ê.
- ↑ "用于上海地铁的URBALIS". alstom.com. July 31, 2003 khòaⁿ--ê.
- ↑ "Here Comes CASCO TRANAVI Qiji™ TACS! Shanghai Metro Line 3/4 will Soon Start the Upgrade of its Signaling System!". www.casco.com.cn. June 26, 2021 khòaⁿ--ê.
- ↑ "上海明珠线二期明年底有望完成 05年正式通车" (ēng Hôa-gí). 搜狐新闻. 2003-03-10. Goân-pún bāng-ia̍h Pó-chûn tī 2020-11-03. 2019-03-09 khòaⁿ--ê.
- ↑ "4号线成为国内首条全国"工人先锋号"地铁线" (ēng Hôa-gí). 人民网上海频道. 2009年10月11日. Goân-pún bāng-ia̍h Pó-chûn tī 2020-05-30. 2015-06-11 khòaⁿ--ê.
- ↑ "Schedule" (ēng Hôa-gí). Shanghai Metro. 2021-07-07. goân-loē-iông tī 2017-11-13 hőng khó͘-pih. 2021-07-07 khòaⁿ--ê.
- ↑ 上海市明珠二期轨道交通车辆 (ēng Hôa-gí). 2013-11-24. goân-loē-iông tī 2020-03-20 hőng khó͘-pih. 2020-03-20 khòaⁿ--ê.
Tsham-ua̍t
siu-kái- Hoàn-slav gí (Huàn-slav gí/Pan-Slavic language)
- James Rumsey kì-liām-pi (James Rumsey Monument)
- Chāi-jīm (tsāi-jīm/Incumbent)
- Hunlân kok-ka phok-bu̍t-koán (Hunlân kok-ka phok-bu̍t-kuán/Suomen kansallismuseo)
- Bió-hāu (Bió-hāu/Alma mater/bú-hāu)